Unknown County, Virginia
22 sites tracked. Something wrong? Fix it Add a missing site
| Site | Status | Construction | Permanent |
|---|---|---|---|
| Digital Carver Dulles 9 | Under construction | No sourced figure yet | No sourced figure yet |
| Digital Realty IAD 39 (44,274 Round Table) | Operating | No sourced figure yet | No sourced figure yet |
| Equinix DC8, Ashburn, Vienna | Operating | No sourced figure yet | No sourced figure yet |
| Google Bristow | Operating (partial) | No sourced figure yet | No sourced figure yet |
| Menlo Digital Richmond Virginia Data Center (Jamestown Drive) | Permitted | No sourced figure yet | No sourced figure yet |
| NuVu County Drive Data Center Campus | Permitted | No sourced figure yet | No sourced figure yet |
| 1,500 Gateway Data Center (denied) | Cancelled | No sourced figure yet | No sourced figure yet |
| 365 Data Centers Herndon (VA1) | Operating | No sourced figure yet | No sourced figure yet |
| 43,915 Devin Shafron | Operating | No sourced figure yet | No sourced figure yet |
| ATI Solutions | Operating | No sourced figure yet | No sourced figure yet |
| Cogent Herndon | Operating | No sourced figure yet | No sourced figure yet |
| EdgeConneX Norfolk (EDCNOR01) | Operating | No sourced figure yet | No sourced figure yet |
| EdgeConneX Richmond (EDCRIC01) | Operating | No sourced figure yet | No sourced figure yet |
| EvoSwitch WDC1 | Operating | No sourced figure yet | No sourced figure yet |
| Evocative Virginia (VA1) | Operating | No sourced figure yet | No sourced figure yet |
| Flex Data Center | Operating | No sourced figure yet | No sourced figure yet |
| Globalinx Virginia Beach CLS | Operating | No sourced figure yet | No sourced figure yet |
| Level(3) Herndon | Operating | No sourced figure yet | No sourced figure yet |
| Pixel Factory Data Center | Operating | No sourced figure yet | No sourced figure yet |
| STACK Infrastructure NVA02 | Operating (partial) | No sourced figure yet | No sourced figure yet |
| TWG Data Halifax Road Campus (former Collier Yard) | Permitted | No sourced figure yet | No sourced figure yet |
| Yondr Manassas Data Center Campus | Announced | No sourced figure yet | No sourced figure yet |
Find data center jobs in Virginia
Sources
- 1.Associated Press race call, 2026 U.S. Senate VA result. ↩
- 2.Congress.gov, S. 5054, Congress.gov, S. 5,054 statement. ↩
- 3.warner.senate.gov, warner.senate.gov statement. ↩
- 4.Associated Press race call, 2026 U.S. House VA-3 result. ↩
- 5.House Clerk, Roll Call 312, House Clerk, Roll Call 312 vote record. ↩
- 6.Associated Press race call, 2026 U.S. House VA-2 result. ↩
- 7.Associated Press race call, 2026 U.S. House VA-4 result. ↩
- 8.mcclellan.house.gov, Sep 17, 2026, mcclellan.house.gov, Sep 17, 2026 statement, Sep 17, 2026. ↩
- 9.Associated Press race call, 2026 U.S. House TX-32 result. ↩
- 10.Associated Press race call, 2026 U.S. House VA-10 result. ↩
- 11.Sep 8, 2026 House release, Sep 8, 2026 House release statement, Sep 8, 2026. ↩
- 12.subramanyam.house.gov, May 8, 2026, subramanyam.house.gov, May 8, 2026 statement, May 8, 2026. ↩
- 13.Associated Press race call, 2026 U.S. House VA-11 result. ↩
- 14.Blue Virginia (video), Blue Virginia (video) statement, Sep 17, 2026. ↩
- 15.Community Impact Q&A, Community Impact Q&A statement, Sep 4, 2026. ↩
- 16.VPM candidate survey, Sep 24, 2026, VPM candidate survey, Sep 24, 2026 statement, Sep 24, 2026. ↩
Who represents this county
Serving now · not on 2026 ballot
Abigail Spanberger (D) · Governor · term ends 2030-01"The expansion of data centers across Loudoun County should have been done vastly differently. We are putting clear standards in place and ensuring that what has been permitted in years past is not permitted into the future."
Governor press release, Oct 29, 2026 · source
Serving now · won 2026 race
Mark R. Warner (D) · U.S. Senator · term ends Jan 3, 20272026 U.S. Senate VA: won by Mark Warner (D), AP call1, not yet certified · official count
Paraphrase: Senate floor speech calling for data center guardrails on water, energy and transparency. Sponsor of S. 5054, the Data Center Tax Accountability and Disclosure Act of 2026.2
Paraphrase: Press release: Warner Statement on Ratepayer Protection Act.3
Contact: website · DC 202-224-2023 · contact form
Serving now · not on 2026 ballot
Tim Kaine (D) · U.S. Senator · term ends Jan 3, 2031"Some communities may have too many, but some would like the opportunity to have one of these data centers that pay a lot of local taxes."
Interview, McClatchy wire via KOTA, May 26, 2026 · source
Contact: website · DC 202-224-4024 · contact form
Serving now · won 2026 race
Robert C. "Bobby" Scott (D) · U.S. Representative (119th) · VA-3 · term ends Jan 3, 20272026 U.S. House VA-3: won by Robert Scott (D), AP call4, not yet certified · official count
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-8351
Serving now · no 2026 result on file
Robert J. Wittman (R) · U.S. Representative (119th) · VA-1 · term ends Jan 3, 20272026 U.S. House VA-1: no result on file yet · official count
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-4261
Outgoing · lost 2026 race · leaves Jan 2027
Jennifer A. Kiggans (R) · U.S. Representative (119th) · VA-22026 U.S. House VA-2: won by Elaine Luria (D), AP call6, not yet certified · official count
Lost 2026 race to Elaine Luria6
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-4215
Serving now · won 2026 race
Jennifer L. McClellan (D) · U.S. Representative (119th) · VA-4 · term ends Jan 3, 20272026 U.S. House VA-4: won by Jennifer McClellan (D), AP call7, not yet certified · official count
the federal government must play a bigger role in ensuring that the costs to power these data centers do not get passed on to consumers and small businesses.8
mcclellan.house.gov, Sep 17, 2026, Sep 17, 2026
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-6365
Serving now · leaving Jan 2027
Julie Johnson (D) · U.S. Representative (119th) · TX-32 · term ends Jan 3, 20272026 U.S. House TX-32: won by Jace Yarbrough (R), AP call9, not yet certified · official count
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-2231
Serving now · no 2026 result on file
John J. McGuire III (R) · U.S. Representative (119th) · VA-5 · term ends Jan 3, 20272026 U.S. House VA-5: no result on file yet · official count
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-4711
Serving now · won 2026 race
Suhas Subramanyam (D) · U.S. Representative (119th) · VA-10 · term ends Jan 3, 20272026 U.S. House VA-10: won by Suhas Subramanyam (D), AP call10, not yet certified · official count
We need a national plan that puts communities first rather than the current ad hoc approach.11
Sep 8, 2026 House release, Sep 8, 2026
Paraphrase: Introduced the Data Infrastructure Risk Reduction Act, a DHS security strategy for communities near data centers.12
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-5136
Serving now · won 2026 race
James R. Walkinshaw (D) · U.S. Representative (119th) · VA-11 · term ends Jan 3, 20272026 U.S. House VA-11: won by James Walkinshaw (D), AP call13, not yet certified · official count
Paraphrase: In a video interview he called for strong federal rules on data centers and warned 'the red lights are flashing right now' on AI.14
Vote: Roll call vote: Yea on H.R. 9340, the Ratepayer Protection Act (passed 417 to 3, Sep 16, 2026). The bill asks states to make large loads such as data centers pay for the grid upgrades they need.5
Contact: website · DC 202-225-1492
Incoming · takes office Jan 2027
Jace Yarbrough (R) · U.S. Representative-elect (120th) · TX-322026 U.S. House TX-32: won by Jace Yarbrough (R), AP call9, not yet certified · official count
Paraphrase: Campaign materials stress more energy production and lower energy costs. No data center position found in Ballotpedia, Community Impact Q&A or campaign platform.15
Incoming · takes office Jan 2027
Elaine Luria (D) · U.S. Representative-elect (120th) · VA-22026 U.S. House VA-2: won by Elaine Luria (D), AP call6, not yet certified · official count
any data center being built needs to have support from the local community with no exceptions, cannot raise electricity costs by one cent on any other rate payer, and must have a closed-loop water system16
VPM candidate survey, Sep 24, 2026, Sep 24, 2026
I firmly oppose giving tax breaks to data centers16
VPM candidate survey, Sep 24, 2026
Questions
How many data centers are in this county?
This page lists every data center campus we track in the county: operating, under construction, permitted and announced. Figures are listed site by site and never added up across claim types. Source
What trades build data centers?
Electricians lead, then pipefitters, HVAC mechanics, ironworkers, equipment operators, laborers and controls technicians. Apprenticeships through union halls and state programs are the main way in. Source
How do I find a data center job near me?
Open any site page and use Find jobs here or use our national jobs page to filter by state and trade. Source
Every figure links to a public source. A blank means we have not linked a source yet, not zero. Sources and methods