California

Santa Clara County, California

67 sites tracked. Something wrong? Fix it Add a missing site

Your county: 67 data center sites, 1 with a sourced job figure, 7 officials who represent them.

Jobs by site. Actual and planned permanent jobs are shown by type and never combined.
SiteStatusConstructionPermanent
5,601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)AnnouncedNo sourced figure yetNo sourced figure yet
Amazon AWS Gilroy Data CenterUnder constructionNo sourced figure yetabout 901 forecast Planned
CoreSite Real Estate 3,032 Coronado, L.P.OperatingNo sourced figure yetNo sourced figure yet
DataBank Santa Clara SFO1OperatingNo sourced figure yetNo sourced figure yet
Digital Realty SJC34OperatingNo sourced figure yetNo sourced figure yet
Digital Realty SJC36 (Lafayette Data Center, 2,825 Lafayette Street)PermittedNo sourced figure yetNo sourced figure yet
Digital Realty Silicon Valley SC1OperatingNo sourced figure yetNo sourced figure yet
EdgeCore Silicon Valley Campus (Laurelwood Data Center)OperatingNo sourced figure yetNo sourced figure yet
Equinix SV1OperatingNo sourced figure yetNo sourced figure yet
Equinix SV2OperatingNo sourced figure yetNo sourced figure yet
Equinix SV4OperatingNo sourced figure yetNo sourced figure yet
Equinix SV6OperatingNo sourced figure yetNo sourced figure yet
Equinix SV8OperatingNo sourced figure yetNo sourced figure yet
Equinix San Jose SV3OperatingNo sourced figure yetNo sourced figure yet
Equinix Silicon Valley CampusOperatingNo sourced figure yetNo sourced figure yet
Google 5,079 to 5,087 Disk Drive Compute Campus (North San José)AnnouncedNo sourced figure yetNo sourced figure yet
Microsoft Alviso Data Center CampusUnder constructionNo sourced figure yetNo sourced figure yet
Microsoft San Jose Data Center Campus (SJ04)AnnouncedNo sourced figure yetNo sourced figure yet
NTT Silicon Valley SV1 Data CenterOperatingNo sourced figure yetNo sourced figure yet
Prime Santa Clara (Silicon Valley campus)OperatingNo sourced figure yetNo sourced figure yet
Prologis STEM ParkAnnouncedNo sourced figure yetNo sourced figure yet
QTS Santa Clara 1OperatingNo sourced figure yetNo sourced figure yet
QTS Santa Clara 2OperatingNo sourced figure yetNo sourced figure yet
STACK InfrastructureOperatingNo sourced figure yetNo sourced figure yet
STACK SVY02OperatingNo sourced figure yetNo sourced figure yet
Sequoia Data Center (2600 De La Cruz Boulevard)PermittedNo sourced figure yetNo sourced figure yet
Vantage Santa Clara I (CA1)OperatingNo sourced figure yetNo sourced figure yet
Vantage Santa Clara II (CA2)OperatingNo sourced figure yetNo sourced figure yet
300 Holger Way Data Center (Menlo Equities conversion)PermittedNo sourced figure yetNo sourced figure yet
865 Embedded Way Data Center (Oppidan / Rockpoint)AnnouncedNo sourced figure yetNo sourced figure yet
Cerebras Systems Data CenterOperatingNo sourced figure yetNo sourced figure yet
Cologix SV1OperatingNo sourced figure yetNo sourced figure yet
Cologix Santa Clara SV1 Data CenterOperatingNo sourced figure yetNo sourced figure yet
ColovoreOperatingNo sourced figure yetNo sourced figure yet
Connect Data Centers Santa Clara (715 Comstock Street)AnnouncedNo sourced figure yetNo sourced figure yet
CoreSite Bowers Data CenterPermittedNo sourced figure yetNo sourced figure yet
CoreSite Real Estate 1,656 McCarthy, L.P.OperatingNo sourced figure yetNo sourced figure yet
CoreSite Real Estate 55 S. Market StreetOperatingNo sourced figure yetNo sourced figure yet
CoreSite SV1, San Jose, CAOperatingNo sourced figure yetNo sourced figure yet
CoreSite SV2 (Milpitas)OperatingNo sourced figure yetNo sourced figure yet
Csquare SFO2OperatingNo sourced figure yetNo sourced figure yet
Csquare SFO3OperatingNo sourced figure yetNo sourced figure yet
Csquare SFO4OperatingNo sourced figure yetNo sourced figure yet
Dell 350 Holger WayOperatingNo sourced figure yetNo sourced figure yet
ECL CSC-1 FlexGrid AI Data CenterAnnouncedNo sourced figure yetNo sourced figure yet
Evocative Santa Clara SJC11OperatingNo sourced figure yetNo sourced figure yet
Forescout Technologies, Inc.OperatingNo sourced figure yetNo sourced figure yet
Former IBM Almaden Research Center Data Center Campus (650 Harry Road)AnnouncedNo sourced figure yetNo sourced figure yet
Goodman Innovation Centre San Jose (NorthTown Data Center)AnnouncedNo sourced figure yetNo sourced figure yet
Intel Santa Clara High-Performance Computing Data CenterOperatingNo sourced figure yetNo sourced figure yet
LBA Realty Data CenterAnnouncedNo sourced figure yetNo sourced figure yet
Layer42 Santa ClaraOperatingNo sourced figure yetNo sourced figure yet
Lumen Santa Clara 1OperatingNo sourced figure yetNo sourced figure yet
Lumen Sunnyvale 1OperatingNo sourced figure yetNo sourced figure yet
Martin Data CenterPermittedNo sourced figure yetNo sourced figure yet
Menlo Digital MD-SV1 (888 to 894 Ross Drive)AnnouncedNo sourced figure yetNo sourced figure yet
Mission College Data CenterOperatingNo sourced figure yetNo sourced figure yet
Northwest Data Center and Communications HubOperatingNo sourced figure yetNo sourced figure yet
OpenColoOperatingNo sourced figure yetNo sourced figure yet
Prologis 326 Charcot Avenue Data Center (North San José)AnnouncedNo sourced figure yetNo sourced figure yet
Prologis Silver Creek Valley Road Data CenterAnnouncedNo sourced figure yetNo sourced figure yet
SV ColoOperatingNo sourced figure yetNo sourced figure yet
Skybox Santa Clara (1200 Memorex Drive)Under constructionNo sourced figure yetNo sourced figure yet
Terra Data CenterAnnouncedNo sourced figure yetNo sourced figure yet
Westbank 180 Park Avenue Data Center (Park Habitat site, downtown San José)AnnouncedNo sourced figure yetNo sourced figure yet
Westbank 300 South First Street Data Center (downtown San José)AnnouncedNo sourced figure yetNo sourced figure yet
Equinix SV5OperatingNo sourced figure yetNo sourced figure yet

Find data center jobs in California

Sources

  1. 1.Amazon, Amazon guest view Q&A for Gilroy Data Center. ↩
  2. 2.Associated Press race call, 2026 Governor CA result. ↩
  3. 3.Associated Press race call, 2026 U.S. House CA-18 result. ↩
  4. 4.Associated Press race call, 2026 U.S. House CA-17 result. ↩
  5. 5.Associated Press race call, 2026 U.S. House CA-19 result. ↩
  6. 6.Associated Press race call, 2026 U.S. House CA-16 result. ↩
  7. 7.Becerra campaign AI page, Becerra campaign AI page statement, May 4, 2026. ↩

Who represents this county

Serving now · leaving Jan 2027
Gavin Newsom (D) · Governor
2026 Governor CA: won by Xavier Becerra (D), AP call2, not yet certified · official count
No public statement on data centers found yet.
Serving now · not on 2026 ballot
Adam B. Schiff (D) · U.S. Senator · term ends Jan 3, 2031
No public statement on data centers found yet.
Contact: website · DC 202-224-3841
Serving now · not on 2026 ballot
Alex Padilla (D) · U.S. Senator · term ends Jan 3, 2029
No public statement on data centers found yet.
Contact: website · DC 202-224-3553 · contact form
Serving now · won 2026 race
Zoe Lofgren (D) · U.S. Representative (119th) · CA-18 · term ends Jan 3, 2027
2026 U.S. House CA-18: won by Zoe Lofgren (D), AP call3, not yet certified · official count
No public statement on data centers found yet.
Contact: website · DC 202-225-3072
Serving now · won 2026 race
Ro Khanna (D) · U.S. Representative (119th) · CA-17 · term ends Jan 3, 2027
2026 U.S. House CA-17: won by Ro Khanna (D), AP call4, not yet certified · official count
No public statement on data centers found yet.
Contact: website · DC 202-225-2631
Serving now · won 2026 race
Jimmy Panetta (D) · U.S. Representative (119th) · CA-19 · term ends Jan 3, 2027
2026 U.S. House CA-19: won by Jimmy Panetta (D), AP call5, not yet certified · official count
No public statement on data centers found yet.
Contact: website · DC 202-225-2861
Serving now · won 2026 race
Sam T. Liccardo (D) · U.S. Representative (119th) · CA-16 · term ends Jan 3, 2027
2026 U.S. House CA-16: won by Sam Liccardo (D), AP call6, not yet certified · official count
No public statement on data centers found yet.
Contact: website · DC 202-225-8104
Incoming · takes office Jan 2027
Xavier Becerra (D) · Governor-elect
2026 Governor CA: won by Xavier Becerra (D), AP call2, not yet certified · official count
I will pursue an economic-forward standard: data centers that operate in California add value to our current energy infrastructure, are powered with clean energy, cover the costs of their own energy needs, and meet environmental performance disclosure requirements.7
Becerra campaign AI page, May 4, 2026

Share this

One figure only. We never add actual and planned jobs together.

Report an issue with this page

Questions

How many data centers are in this county?

This page lists every data center campus we track in the county: operating, under construction, permitted and announced. Figures are listed site by site and never added up across claim types. Source

What trades build data centers?

Electricians lead, then pipefitters, HVAC mechanics, ironworkers, equipment operators, laborers and controls technicians. Apprenticeships through union halls and state programs are the main way in. Source

How do I find a data center job near me?

Open any site page and use Find jobs here or use our national jobs page to filter by state and trade. Source

Every figure links to a public source. A blank means we have not linked a source yet, not zero. Sources and methods