Home › States › Ohio

Data centers in Ohio

Every site we track in Ohio, the jobs each one brings where a public source states them and the officials who represent them.

More: See Ohio on the map · What changed near you · Ohio officials · Filter all Ohio sites

Count178sites tracked (95 operating, 29 under construction, 54 announced)
Single-site maximum1,200largest sourced construction figure at one site (3 sites sourced; not added up)
Count20sites with sourced planned permanent jobs
Sum of 12 sites$24.7 billionannounced investment at 12 sites
What changed after November 3

Election Day was Nov 3, 2026. These are winners of AP-called races who take office in January 2027. Each links to its AP race call. This box covers races for governor, U.S. Senate and U.S. House only. Other statewide offices, such as lieutenant governor, are not included. Results are unofficial until Ohio certifies them.

  • Amy Acton (D), Governor-elect. Called by AP. source
  • Sherrod Brown (D), U.S. Senator-elect. Called by AP. source
  • Don Leonard (D), U.S. Representative-elect, OH-15. Called by AP. source
  • Brian Poindexter (D), U.S. Representative-elect, OH-7. Called by AP. source

Sites in Ohio

Sites with sourced job numbers first. Construction and permanent jobs are shown separately and never added together.

SiteCountyStatusConstruction jobsPermanent jobs
PORTS-Pike Technology Campus
SB Energy
PikeUnder constructionnot stated2,500
AWS Sprigg Township Data Center Campus (Buck Canyon)
Amazon Web Services (land held via Buck Canyon Properties)
AdamsAnnouncednot stated500
Meta Prometheus (New Albany)
Meta
LickingOperating1,200more than 300
Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)
Aligned Data Centers
RossAnnouncednot stated240
Midwest Digital Gateway (Central Avenue SE, Canton)
Corscale
StarkAnnouncednot stated150
Prologis Project Mila
Prologis
ButlerAnnouncednot stated140
5C Group / Vultr Data Center (Prime Ohio)
5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)
ClarkUnder constructionnot stated120
Meta Bowling Green (Project Accordion)
Meta
WoodUnder constructionmore than 1,000about 100
Amazon Web Services Wilmington Data Center Campus
Amazon Web Services
ClintonAnnouncednot statedat least 100
Project Klondike
Meta
MiamiAnnouncednot statedmore than 100
AWS Project Galaxy, Sidney, OH
Amazon Web Services
ShelbyUnder constructionnot statedat least 75
DAMAC Digital Canton Orchard View Data Center
DAMAC Digital
StarkAnnouncednot statedapproximately 60
Vantage Data Centers OH2 (Millersport Campus)
Vantage Data Centers
FairfieldUnder constructionnot stated37
EdgeConneX MCN New Albany (South Campus)
EdgeConneX
LickingUnder constructionnot stated32
Google Columbus Data Center (South High St / Rathmell Rd, former Hartman Farm)
Google (owner of record Magellan Enterprises LLC)
FranklinOperatingnot stated20
Aligned NEO-01
Aligned Data Centers
ErieUnder constructionnot stated18
Vantage Data Centers OH1
Vantage Data Centers
LickingUnder constructionnot stated12
CyrusOne Lebanon Campus (CIN5 & CIN7)
CyrusOne
WarrenOperatingnot stated10
CyrusOne New Albany COL-1
CyrusOne
LickingUnder constructionnot stated10
QTS New Albany 1
QTS Data Centers
LickingUnder constructionnot stated10
Show all 178 sites
SiteCountyStatusConstruction jobsPermanent jobs
Bitdeer Massillon Facility
Bitdeer
StarkOperatingmore than 300not stated
180 E Broad St.
Owner not yet confirmed
Operatingnot statednot stated
AWS Cosgray Road Campus
Amazon Web Services
FranklinOperatingnot statednot stated
AWS Crosby Court Campus
Amazon Web Services
FranklinOperatingnot statednot stated
AWS Delaware County (proposed)
Amazon Web Services
DelawareAnnouncednot statednot stated
AWS Fayette County (Jefferson Township)
Amazon Web Services
FayetteUnder constructionnot statednot stated
AWS Hayden Run Campus
Amazon Web Services
FranklinOperatingnot statednot stated
AWS Industrial Parkway Campus (Jerome Township)
Amazon Web Services
UnionOperatingnot statednot stated
AWS New Albany (2550 Beech Road)
Amazon Web Services
LickingOperatingnot statednot stated
AWS New Albany (Beech/Miller Road Campus)
Amazon Web Services
LickingUnder constructionnot statednot stated
AWS New Albany Campus 1
Amazon Web Services
LickingOperatingnot statednot stated
AWS New Albany Campus 3 (expansion)
Amazon Web Services
LickingUnder constructionnot statednot stated
AWS Project Cosmos
Amazon Web Services
UnionUnder constructionnot statednot stated
AWS Scioto Darby Campus
Amazon Web Services
FranklinOperatingnot statednot stated
AWS Trenton / Madison-St. Clair Township Campus
Amazon Web Services
ButlerAnnouncednot statednot stated
Aberdeen Data Center
Owner not yet confirmed
AdamsAnnouncednot statednot stated
AgriFORCE Bitcoin Mining Facility, East Palestine
AgriFORCE Growing Systems Ltd.
ColumbianaOperatingnot statednot stated
AgriFORCE Bitcoin Mining Facility, West Point
AgriFORCE Growing Systems Ltd.
ColumbianaOperatingnot statednot stated
Aligned Conesville / Coshocton
Aligned Data Centers
CoshoctonAnnouncednot statednot stated
Aligned Data Centers, Conesville Industrial Park
Aligned Data Centers
CoshoctonUnder constructionnot statednot stated
Aligned Sandusky (Northeast Ohio)
Aligned Data Centers
ErieUnder constructionnot statednot stated
Amazon Jeffersonville Data Center
Amazon Web Services
FayetteAnnouncednot statednot stated
Amazon Perry Township Data Center
Amazon Web Services
StarkUnder constructionnot statednot stated
Amazon Project Galaxy
Amazon Web Services
ShelbyAnnouncednot statednot stated
Amazon Sunbury Data Center
Owner not yet confirmed
DelawareUnder constructionnot statednot stated
Amazon Web Services CMH53
Amazon Web Services
LickingOperatingnot statednot stated
Amplex DC0
Owner not yet confirmed
Operatingnot statednot stated
Ardent Technologies Wilmington Data Center
Ardent Technologies
ClintonAnnouncednot statednot stated
Ark Data Centers Akron I (fka Involta)
Ark Data Centers (formerly Involta)
SummitOperatingnot statednot stated
Ark Data Centers Canton
Ark Data Centers
StarkOperatingnot statednot stated
Ark Data Centers Independence (fka Involta)
Ark Data Centers (formerly Involta)
CuyahogaOperatingnot statednot stated
Ashville Campus
EdgeConneX
PickawayAnnouncednot statednot stated
BIT Mining / Viking Data Centers, Akron
BIT Mining / Viking Data Centers
SummitOperatingnot statednot stated
Bistrozzi LLC Data Center
Owner not yet confirmed
AllenAnnouncednot statednot stated
Bitdeer Clarington HPC/AI Campus
Bitdeer
MonroeUnder constructionnot statednot stated
Bitdeer Shalersville Data Center Campus
Bitdeer
PortageAnnouncednot statednot stated
BlueBridge Networks Mayfield Heights Data Center
BlueBridge Networks
CuyahogaOperatingnot statednot stated
BlueBridge Networks | Downtown Cleveland
Owner not yet confirmed
Operatingnot statednot stated
Bresco Broadband Data Center
Owner not yet confirmed
Operatingnot statednot stated
Bristolville 25
Bristolville 25 Developer LLC / BHGH Properties
TrumbullAnnouncednot statednot stated
CMH3
Owner not yet confirmed
DelawareOperatingnot statednot stated
COL 5 (Cologix) Data Center
Owner not yet confirmed
DelawareAnnouncednot statednot stated
Carrier Services Group
Owner not yet confirmed
MahoningOperatingnot statednot stated
Centersquare (Csquare) CMH1 Lewis Center
Centersquare (Csquare)
DelawareOperatingnot statednot stated
Centersquare Columbus (CMH1)
CenterSquare (formerly Cyxtera)
Operatingnot statednot stated
CeraNet Data Center (Morrison Road)
CeraNet, Inc.
FranklinOperatingnot statednot stated
Cipher Digital Ulysses
Cipher Digital (formerly Cipher Mining)
MorganAnnouncednot statednot stated
Citynet Columbus
Owner not yet confirmed
Operatingnot statednot stated
Cogent Cleveland 2
Cogent Communications
Operatingnot statednot stated
Cogent Data Center Akron
Cogent Communications
SummitOperatingnot statednot stated
Cologix COL1 (Columbus)
Cologix
FranklinOperatingnot statednot stated
Cologix COL5
Cologix
DelawareUnder constructionnot statednot stated
Cologix Johnstown AI-Ready Campus
Cologix
LickingUnder constructionnot statednot stated
Compugen New Albany Data Center
Compugen (owner of record Compugen Real Estate Holdings Inc)
FranklinOperatingnot statednot stated
Continental Plaza
Owner not yet confirmed
Operatingnot statednot stated
Crane Data Centers Pierce Township Campus (near Beckjord)
Crane Data Centers
ClermontAnnouncednot statednot stated
CyrusOne CIN2 (Cincinnati)
CyrusOne
HamiltonOperatingnot statednot stated
CyrusOne CIN3 (Cincinnati-Mason)
CyrusOne
WarrenOperatingnot statednot stated
CyrusOne CIN4 (Hamilton)
CyrusOne
ButlerOperatingnot statednot stated
CyrusOne COL-1
Owner not yet confirmed
LickingUnder constructionnot statednot stated
DartPoints CMH01 (Dublin)
DartPoints
FranklinOperatingnot statednot stated
DartPoints Cincinnati
DartPoints
HamiltonOperatingnot statednot stated
DartPoints Dublin, OH, CMH1
Owner not yet confirmed
Operatingnot statednot stated
DataBank Cleveland (CLE1)
DataBank
CuyahogaOperatingnot statednot stated
DataCenter.BZ, Worthington-Columbus
Owner not yet confirmed
Operatingnot statednot stated
DataYard Dayton Data Center
DataYard
MontgomeryOperatingnot statednot stated
Discover New Albany Data Center
Discover Properties LLC (Discover Financial Services; owner of record)
FranklinOperatingnot statednot stated
EdgeConneX New Albany Data Center
EdgeConneX, Inc.
LickingUnder constructionnot statednot stated
Edged Columbus
Edged (an Endeavour company)
FranklinOperatingnot statednot stated
Encore Technologies BLU1 (Blue Ash)
Encore Technologies
HamiltonOperatingnot statednot stated
Encore Technologies Data Center (8700 Governors Hill Dr)
Encore Technologies
HamiltonOperatingnot statednot stated
Encore Technologies MSB1 (Miamisburg)
Encore Technologies
MontgomeryOperatingnot statednot stated
Encore Technologies NOR1 (Norwood)
Encore Technologies
HamiltonOperatingnot statednot stated
Everstream Parma Data Center
Owner not yet confirmed
Operatingnot statednot stated
Expedient CMH1 (Upper Arlington)
Expedient
FranklinOperatingnot statednot stated
Expedient CMH2 (Dublin)
Expedient
FranklinOperatingnot statednot stated
Expedient CMH3 (Lewis Center)
Expedient
DelawareOperatingnot statednot stated
Expedient Cleveland (NEO 151 / NEO 152)
Expedient
CuyahogaOperatingnot statednot stated
Expedient Cleveland, 151 NEO
Expedient, LLC
Operatingnot statednot stated
Expedient Columbus, Dublin
Expedient, LLC
Operatingnot statednot stated
Expedient Columbus, Upper Arlington
Expedient, LLC
Operatingnot statednot stated
FairlawnGig Service Center
Owner not yet confirmed
Operatingnot statednot stated
Flexential Cincinnati (CIN01/02)
Flexential
ButlerOperatingnot statednot stated
Franklin Furnace Data Center
Google
SciotoAnnouncednot statednot stated
Fusion, Cleveland
Owner not yet confirmed
Operatingnot statednot stated
Google Lancaster Data Center
Google
FairfieldOperatingnot statednot stated
Google Lockbourne, OH
Google
FranklinOperatingnot statednot stated
Google NBY-3
Google
LickingOperatingnot statednot stated
Google New Albany Data Center
Google
FranklinOperatingnot statednot stated
Google Project BOSC (Lima)
Google
AllenAnnouncednot statednot stated
Google Union County (proposed)
Google
UnionAnnouncednot statednot stated
H5 Data Center
Prime Data Centers
CuyahogaOperatingnot statednot stated
H5 Data Centers Cincinnati I
H5 Data Centers
HamiltonOperatingnot statednot stated
H5 Data Centers Cleveland
H5 Data Centers
CuyahogaOperatingnot statednot stated
Hanging Rock / Haverhill Data Center
Strata Expense (backed by Supermicro + Ravel)
LawrenceUnder constructionnot statednot stated
HashWorks Powered Land, Waterford Site
HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)
WashingtonAnnouncednot statednot stated
Involta Independence
Owner not yet confirmed
CuyahogaOperatingnot statednot stated
Involta-Akron
Owner not yet confirmed
SummitOperatingnot statednot stated
Iron Mountain Data Center, Ohio (OHS-1)
Owner not yet confirmed
Operatingnot statednot stated
Iron Mountain OHS-1 (Miamisburg)
Iron Mountain
MontgomeryOperatingnot statednot stated
J5 LLC Data Center
Cleanview
MiamiAnnouncednot statednot stated
Johnstown Data Center (Beech Rd.)
Owner not yet confirmed
LickingAnnouncednot statednot stated
Karis Critical Smart Farms Data Center Campus (New Albany)
Karis Critical (owner of record Karis Critical CMH Smart LLC)
LickingAnnouncednot statednot stated
LSTI 401 Market
Owner not yet confirmed
Operatingnot statednot stated
Level(3) Cincinnati
Lumen Technologies
Operatingnot statednot stated
LexisNexus Springfield
Owner not yet confirmed
ClarkOperatingnot statednot stated
Logistix Data Center
Logistix Property Group
ButlerAnnouncednot statednot stated
Lumen Akron 2
Lumen Technologies
SummitOperatingnot statednot stated
Lumen Cleveland 1
Lumen Technologies
CuyahogaOperatingnot statednot stated
MARA Findlay Data Center
MARA Holdings
HancockUnder constructionnot statednot stated
MARA Hannibal Data Center
MARA Holdings
MonroeOperatingnot statednot stated
MARA Hopedale Data Center
MARA Holdings
HarrisonOperatingnot statednot stated
Mara Holdings
Owner not yet confirmed
MonroeAnnouncednot statednot stated
Microsoft Heath Data Center
Microsoft
LickingUnder constructionnot statednot stated
Microsoft Hebron Data Center
Microsoft
LickingUnder constructionnot statednot stated
Microsoft Licking County (Heath/Hebron/New Albany)
Microsoft
LickingAnnouncednot statednot stated
Microsoft Licking County Campus 1
Microsoft
LickingAnnouncednot statednot stated
Microsoft New Albany Data Center (Beech Road)
Microsoft
LickingUnder constructionnot statednot stated
Microtronix Datacenter Ottoville
Owner not yet confirmed
Operatingnot statednot stated
Monclova Data Center
Owner not yet confirmed
LucasAnnouncednot statednot stated
Mount Orab Mega-Site Data Center Campus
DB Stu LLC
BrownAnnouncednot statednot stated
Oppidan
Owner not yet confirmed
FranklinOperatingnot statednot stated
Oregon Industrial Park Data Center Campus
Capacity LLC
LucasAnnouncednot statednot stated
PRSM Data Center
Owner not yet confirmed
PrebleAnnouncednot statednot stated
Pacifico Data Center
Owner not yet confirmed
PickawayAnnouncednot statednot stated
Project Andromeda (Oxford Township)
AVAIO Digital
ErieAnnouncednot statednot stated
Project Astralus (Yellow Creek Township)
Zuharis
ColumbianaAnnouncednot statednot stated
Project BOSC
Google
AllenAnnouncednot statednot stated
Project Dazzler
Google
SciotoAnnouncednot statednot stated
Project Mila
Prologis
ButlerAnnouncednot statednot stated
Project Shelby
Panattoni
StarkAnnouncednot statednot stated
Project Triton
Owner not yet confirmed
SummitAnnouncednot statednot stated
Province Group Perry Village Data Center Campus
Province Group
LakeAnnouncednot statednot stated
QTS NAL 2 DC2
QTS Data Centers
LickingOperatingnot statednot stated
QTS New Albany IV
QTS Data Centers
LickingAnnouncednot statednot stated
QTS Van Wert Data Center Campus
QTS Data Centers
Van WertAnnouncednot statednot stated
Racksquared Data Center (Columbus)
Racksquared Data Centers, LLC
FranklinOperatingnot statednot stated
Racksquared Data Centers
Owner not yet confirmed
Operatingnot statednot stated
Ravel Data Center
Strata
LawrenceAnnouncednot statednot stated
SR-14 Data Center Proposal (Ravenna)
Ray Harner (landowner-developer)
PortageAnnouncednot statednot stated
STACK Infrastructure NAL01 (New Albany)
STACK Infrastructure
FranklinOperatingnot statednot stated
STACK New Albany
STACK Infrastructure
FranklinOperatingnot statednot stated
Saadia Holding Athens-Dover Township Data Center
Saadia Holding LLC
AthensAnnouncednot statednot stated
Sammis Power Plant Data Center
Owner not yet confirmed
JeffersonAnnouncednot statednot stated
Standard Power Coshocton
Standard Power
CoshoctonOperatingnot statednot stated
Stargate Lordstown Campus
OpenAI / SoftBank / Oracle
TrumbullUnder constructionnot statednot stated
State of Ohio Computer Center (SOCC)
State of Ohio
FranklinOperatingnot statednot stated
T5@Cleveland
T5 Data Centers
CuyahogaOperatingnot statednot stated
TJX Companies Data Center (New Albany, OH)
Owner not yet confirmed
FranklinOperatingnot statednot stated
TJX New Albany Data Center
TJX Companies Inc (owner of record)
FranklinOperatingnot statednot stated
Tech Mahindra Cleveland
Owner not yet confirmed
Operatingnot statednot stated
Urbana Technology Hub
Thor Equities
ChampaignAnnouncednot statednot stated
WOW! Business (Columbus Datacenter)
Owner not yet confirmed
Operatingnot statednot stated
Waterville Data Center
Owner not yet confirmed
LucasAnnouncednot statednot stated
Whitetail Creek Data Center
Bitdeer
TrumbullAnnouncednot statednot stated
WēConnect Westerville
Owner not yet confirmed
Operatingnot statednot stated
ark data centers, Cleveland, OH
Owner not yet confirmed
Operatingnot statednot stated
ark data centers, Youngstown, OH
Owner not yet confirmed
Operatingnot statednot stated

Counties with data center sites

Show all 45 counties
Embed this state card
<iframe src="https://mainstreetmegawatt.com/embed/state/oh.html" width="100%" height="220" style="border:0" loading="lazy" title="Data centers in Ohio"></iframe>

What does this mean for your community?

Electric bills, water, housing and taxes in Data centers in Ohio: sites, jobs and officials: what we know, what remains unknown and who can answer. Statewide figures are context, not forecasts for any one community.

Will my electric bill rise?

No sourced figure yet for this state.

In writing
No modeled or measured estimate of the effect on household bills has been published for this state.
What remains unknown
The effect on household bills in most states.
Who can answer
Your state utility commission and your utility's rate cases.
Ask
Will data centers pay the full cost of the power lines and plants built for them? Where is that written in a rate order?

How much water will it use?

No sourced figure yet for this state.

In writing
No tracked project in this state has a published water figure in our sources.
What remains unknown
Water use for nearly every other project.
Who can answer
Your local water utility and county commission.
Ask
How much water will this project use each day? Where will it come from?

Will housing get more expensive?

No sourced figure yet for this state.

In writing
No public body we found tracks data center effects on local rents or land prices.
What remains unknown
Effects on local land prices, rents and housing.
Who can answer
Local land records and planning commission minutes.
Ask
Has anyone studied what this project will do to local rents and home prices?

What are taxpayers giving up?

21 Ohio data center sales tax exemption approvals since 2014, with $39.2 billion committed investment and $2.38 billion in estimated exemption value (state summary, Jun 10, 2026) (statewide).

In writing
11 sourced tax incentive records from state and local filings. See the records
What remains unknown
The full public cost and the net tax revenue for most projects.
Who can answer
Your state economic development agency and county commission.
Ask
What tax breaks does this project get? What must it deliver in return?

What the agreements say

  • Statewide: 21 Ohio data center sales tax exemption approvals since 2014, with $39.2 billion committed investment and $2.38 billion in estimated exemption value (state summary, Jun 10, 2026).
  • Statewide: Ohio's data center equipment sales tax exemption: $141.8 million forgone in FY 2026 and $148.0 million in FY 2027 (state estimate).
  • H5 Data Centers Cleveland: 100% state sales tax exemption for 15 years, estimated value $20.0 million (approved Jan 27, 2014).

From 11 signed or approved incentive records in our sources for this state. Terms are as published; we have not audited whether commitments were met.

Ask your officials who pays

Your officials in Ohio

Mike DeWine R

Governor · 178 sites represented
Quote

"This is where the future is. This is now. And we have to be a part of it." source

Bernie Moreno R

U.S. Senator · 178 sites represented
QuoteParaphrase

"Taxpayers will not subsidize data centers, period. When state and local governments hand out corporate welfare to these massive corporations, the federal government must intervene and shut it down." source

Call 202-224-2315

Jon Husted R

U.S. Senator · 178 sites represented
Quote

"If America wants to lead the world in AI and strengthen our national security, we have to build the energy infrastructure to support it. But we must do that without passing the costs on to working families and small businesses." source

Call 202-224-3353

Troy Balderson R

U.S. Representative · OH-12 · 30 sites represented
QuoteVote

"There’s a place for data centers. Now, is it in someone’s backyard? Absolutely not." source

Call 202-225-5355

Mike Carey R

U.S. Representative · OH-15 · 23 sites represented
Vote
Call 202-225-2015

Joyce Beatty D

U.S. Representative · OH-3 · 17 sites represented
Vote
Call 202-225-4324

Jim Jordan R

U.S. Representative · OH-4 · 14 sites represented
Vote
Call 202-225-2676

David J. Taylor R

U.S. Representative · OH-2 · 14 sites represented
Vote
Call 202-225-3164

Michael A. Rulli R

U.S. Representative · OH-6 · 13 sites represented
Vote
Call 202-225-5705
Show all serving officials (9 more)

Shontel M. Brown D

U.S. Representative · OH-11 · 12 sites represented
Vote
Call 202-225-7032

Emilia Strong Sykes D

U.S. Representative · OH-13 · 12 sites represented
Vote
Call 202-225-6265

Greg Landsman D

U.S. Representative · OH-1 · 9 sites represented
Vote
Call 202-225-2216

Warren Davidson R

U.S. Representative · OH-8 · 7 sites represented
Vote
Call 202-225-6205

Marcy Kaptur D

U.S. Representative · OH-9 · 6 sites represented
Vote
Call 202-225-4146

Michael R. Turner R

U.S. Representative · OH-10 · 6 sites represented
Vote
Call 202-225-6465

David P. Joyce R

U.S. Representative · OH-14 · 6 sites represented
Vote
Call 202-225-5731

Robert E. Latta R

U.S. Representative · OH-5 · 5 sites represented
Vote
Call 202-225-6405

Max L. Miller R

U.S. Representative · OH-7 · 4 sites represented
Vote
Call 202-225-3876

Incoming in January 2027

Amy Acton D

Governor-elect · 178 sites represented
Quote

"As governor, I will take immediate action and support a conditional moratorium on data centers to ensure they cover one hundred percent of their utility costs, exclusively build with union labor, operate with full transparency, adhere to Ohio's environmental standards, support the needs of local communities, and bring jobs to former industrial areas that have been left behind," source

Sherrod Brown D

U.S. Senator-elect · 178 sites represented
Quote

"I do not work for data centers." source

Don Leonard D

U.S. Representative-elect · OH-15 · 23 sites represented
Paraphrase

Brian Poindexter D

U.S. Representative-elect · OH-7 · 4 sites represented
QuoteParaphrase

"Local communities must have control over whether data centers are built, and no one should pay a cent more for utilities to subsidize data centers." source